The following cost estimates were provided for your project: Cost of soil: $80.00 per cubic yard Cost of sand: $100.00 per cubic yard Cost of Sod: $100.00 per roll that is 3’ by 30’ Tree and shrubbery installation: $2500.00 You are at the final phase of your project and are doing final grading and landscaping. The estimates are 8 cubic yards of soil, 3 cubic yards of sand, 3600 square feet of sod, and tree/shrubbery installation. Including a 3 percent contingency, what is the estimated total cost?