A large disaster cleaning company estimates that 30 percent of the jobs it bids on are finished within the bid time. Looking at a random sample of 8 jobs that it has contracted, calculate the mean number of jobs completed within the bid time.

Respuesta :

Answer: 2.4

Step-by-step explanation:

Given : A large disaster cleaning company estimates that 30 percent of the jobs it bids on are finished within the bid time.

i..e The proportion of  the jobs it bids on are finished within the bid time: p = 30%= 0.30

Sample size of jobs that it has contracted : n= 8

Then ,  the mean number of jobs completed within the bid time : [tex]\mu=np[/tex]

[tex]= 8\times0.30=2.4[/tex]

Hence, the mean number of jobs completed within the bid time is 2.4 .