Answer:
Explanation:
Given:
So we can form the linear equation that model this situation:
The standard form of it is:
Q = mL + b
So the slope of it is:
<=> m = (152 - 125) / (6 -5)
<=> m = 27
Then the marginal product of the 6th worker 27 units of output.