To find the average total cost, you divide the total cost by the number of units produced.
Average Total Cost = Total Cost / Number of Units Produced
Given:
Total cost = K400
Number of units produced = 155
Average Total Cost = 400 / 155
Average Total Cost ≈ K2.58
Therefore, the average total cost is approximately K2.58 per unit.